TOP > International Activities > The 2nd International Expert Group (IEG) meeting

The 2nd International Expert Group (IEG) meeting

The first meeting of ”International Expert Group (IEG),” established for the purpose of gathering knowledge from around the world was held from Feb.17-21.

  • (IEG member)
  • Dr. Douglas Chapin (Chairman), USA
  • Dr. Rosa Yang, USA
  • Dr. Adrian Simper, UK
  • Dr. Joel Pijselman, France
  • Mr. Nikolai Steinberg, Ukraine
  • Dr. Anton Leshchenko, Russia
  • Mr. Robert Coward, USA (Assistant for Chairman)

IEG member visiting Fukushima Daiichi Power Plant Station on Sep. 19.

  • [Photos] Click image to enlarge.
  • [Videos] Click “Download video” to download MP4 file.

[Photos]
  • Remote control room for rubble clearance and decontamination in Unit No.3

  • Remote control room for rubble clearance and decontamination in Unit No.3

  • Remote control room for rubble clearance and decontamination in Unit No.3

  • In the touring bus

  • In the touring bus

  • In the touring bus

  • In the touring bus

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • IEG member observing fuels transferred from Unit No.4 to the common pool

  • Construction site for a frozen ground wall

  • Construction site for a frozen ground wall

  • Construction site for a frozen ground wall

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Inside the Common Pool Building

  • Common Pool Building

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Contaminated water storage tank area (H3)

  • Area to install additional contaminated water storage tanks (J)

  • Area to install additional contaminated water storage tanks (J)

  • Area of Unit No.2 and No.3 to install advanced liquid processing system (ALPS)

  • Opinion exchange between IEG and Executives of Fukushima Daiichi Nuclear Power Station

  • Opinion exchange between IEG and Executives of Fukushima Daiichi Nuclear Power Station

  • Opinion exchange between IEG and Executives of Fukushima Daiichi Nuclear Power Station

During this period, several meetings were held where opinions were exchanged.

  • [Photos] Click image to enlarge.
  • [Videos] Click “Download video” to download MP4 file.

[Photos]Meeting at IRID office on Sep. 20.


[Photos]Closing meeting at Kokukaikan in Tokyo and Dr. Chapin answering questions during an interview.